Kozienice 2 × 668 MWe CCGT units (~1.3 GW) – EPC by Çalik Enerji, project finance closed (PLN 8.05bn total, EPC PLN 6.95bn), foundations under way
ترسية عقد – Poland
Piping, mechanical erection, E&I, insulation and heavy-lift subcontractors should approach Çalik Enerji now that this 1.3 GW gas-fired plant is fully financed with handovers due in 2029.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Poland · Kozienice |
| Client / owner | Enea (Enea Elkogaz) |
| Awarded to | Çalik Enerji (EPC); Energoprojekt-Katowice (designer); GE Vernova (steam turbines, generators) |
| Value | PLN 8.05bn |
| Announced | 04 Nov 2026 |
| Project type | Power plants & renewables, Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Heavy lifting, rigging & transport (main package)
- MV/HV substations & transmission lines
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Scaffolding & access
- Industrial hot & cold insulation
- NDT, inspection & certification
- Pipes, valves & fittings supply
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.