1712 live leads · 55 new today · updated 24 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Rwanda

Pre-qualification / EOI

Lake Sake 200 MW floating solar PV + 800 MWh BESS IPP (design, supply, install, commission, 25-yr O&M, substation and 220 kV grid link) – pre-qualification call for IPPs

تأهيل مسبق – Rwanda

EDCL is pre-qualifying IPPs for a 200 MW floating solar plant with 800 MWh storage on Lake Sake; IPPs, floating-PV EPCs and BESS integrators should pursue the call.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryRwanda · Lake Sake, Ngoma District
Client / ownerEnergy Development Corporation Limited (EDCL, Rwanda Energy Group); off-taker EUCL
Announced19 Oct 2026
Project typePower plants & renewables, Substations & transmission grids

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Open tenderArgentinaUSD 800MOpen – deadline not published

AMBA I transmission expansion – ~270 km of 500/220/132 kV lines, new Plomer substation & reactive compensation, tender launched, first offers Dec 2026; IDB approves USD 200M guarantee (USD ~800M)

Client: Government of Argentina – national 500 kV transmission expansion plan (IDB-guaranteed)

Contract awardMalaysiaMYR 34.39MContract awarded – subcontracting open

33 kV underground cable connection from Sungai Udang waste-to-energy plant to TNB PMU Cheng substation – EPCC, completion May 2029 (MYR 34.39M)

Awarded to MMC Engineering Sdn Bhd · Client: Sungai Udang WTE Sdn Bhd (Malakoff Corp)

Contract awardIndiaContract awarded – subcontracting open

LOI – 20 MW / 120 MWh vanadium redox flow battery energy storage system, EPC + 10-yr O&M at GIPCL Vadodara gas power complex

Awarded to Bondada Engineering · Client: Gujarat Industries Power Company Limited (GIPCL)

Pre-qualification / EOICôte d'IvoireXOF 33bnOpen – deadline not published

Tongon 52 MWp solar PV plant (~50 ha) – project launched, EPC bids under evaluation, construction 2027, COD by mid-2028 (XOF 33bn)

Client: Tongon Solaire SAS

Pre-qualification / EOIRomaniaEUR 40MOpen – deadline not published

Entek (Tüpraş) 2 x 300 MWh battery storage facility next to its 214 MW solar plant – phase 1 150 MW / 2 h planned (EUR 40M)

Client: Entek Elektrik Üretimi A.Ş. (Tüpraş group)

Want more leads like this?Get Solar PV & battery storage, MV/HV substations & transmission lines opportunities in your inbox every morning.
Get free alerts →