Lesotho Highlands Water Project Phase II – Oxbow hydropower scheme geotechnical investigations: Phase 2 intrusive works (18 boreholes, ~2,648 m drilling & testing)
ترسية عقد – Lesotho
Site investigation contracts for the Oxbow hydropower scheme – drilling, lab testing and logistics suppliers can support the geotechnical contractor.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Lesotho · Oxbow (Malibamatso River) |
| Client / owner | Lesotho Highlands Development Authority (LHDA) |
| Awarded to | Geomech Africa (subcontractors Skyhorse Aviation, Open Ground Resources); Phase 1 geophysics: Open Ground Resources (ZAR 6M) |
| Value | ZAR 100M |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables, Water, desalination & treatment |
Trades and packages needed
- Land surveying & geotechnical investigation (main package)
- Materials testing & QA/QC laboratory (main package)
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.