Libya LNG-to-power programme – coastal gas pipeline completion frameworks approved and FSRU tender documents being prepared ahead of summer-2027 peak
برنامج ليبيا لاستخدام الغاز الطبيعي المسال في توليد الكهرباء – اعتماد أطر استكمال خط الغاز الساحلي وإعداد وثائق مناقصة وحدات التخزين وإعادة التغويز العائمة قبل ذروة صيف 2027
Pipeline contractors and FSRU owners/operators should prepare for Libya's coming FSRU and coastal gas pipeline tenders tied to summer-2027 power demand.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Libya |
| Client / owner | Ministry of Industry & Minerals – LNG Study Committee / Sirte Oil Company / NOC |
| Announced | 09 Nov 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants, Power plants & renewables |
Trades and packages needed
- Pipeline construction (main package)
- Pipes, valves & fittings supply (main package)
- Cathodic protection
- NDT, inspection & certification
- Marine works, dredging & reclamation
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.