Line installation contractors Batch 2, Lots 9–11 – ~440 km MV and ~1,104 km LV distribution lines, Western Region, UG-MEMD-550339-CW-RFB (World Bank EASP)
مناقصة – Uganda
MV/LV line builders should bid the three Western Uganda EASP lots (wooden poles, max two lots per bidder, 24 months); bids due 2026-12-04.
| Type | Open tender |
|---|---|
| Status | Open – closes 04 Dec 2026 (43 days) |
| Country | Uganda · Ibanda / Mitooma / Kakumiro |
| Client / owner | Electricity Access Scale-up Project (EASP) – Ministry of Energy and Mineral Development |
| Announced | 12 Oct 2026 |
| Deadline | 04 Dec 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Electrical installation (LV) (main package)
- Cables, switchgear & electrical materials (main package)
What to do
Register with the client and request the tender documents before the deadline.