Line installation contractors Batch 3, Lots 5–8 – ~471 km MV and ~925 km LV distribution lines, Northern, Eastern & Central regions, UG-MEMD-550341-CW-RFB (World Bank EASP)
مناقصة – Uganda
Power distribution line contractors should bid MEMD's four EASP rural electrification lots (concrete/wooden poles, 6-month build); bids due 2026-12-03.
| Type | Open tender |
|---|---|
| Status | Open – closes 03 Dec 2026 (42 days) |
| Country | Uganda · Lira / Bukedea / Jinja / Mpigi |
| Client / owner | Electricity Access Scale-up Project (EASP) – Ministry of Energy and Mineral Development |
| Announced | 12 Oct 2026 |
| Deadline | 03 Dec 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Electrical installation (LV) (main package)
- Cables, switchgear & electrical materials (main package)
What to do
Register with the client and request the tender documents before the deadline.