Lion Thorn Solar Park – 49 MW PV for PPC (wheeled), EPC by PowerChina, ground broken (COD 2028)
ترسية عقد – South Africa
PowerChina will buy local civils, piling, mounting-structure, cabling and grid-connection packages for this 49 MW North West solar plant.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | South Africa · Leeudoringstad, North West |
| Client / owner | Yellow Door Energy |
| Awarded to | PowerChina |
| Announced | 12 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines
- Cables, switchgear & electrical materials
- Earthworks, excavation & site grading
- Piling & deep foundations
- Electrical installation (LV)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.