LOI – 20 MW / 120 MWh vanadium redox flow battery energy storage system, EPC + 10-yr O&M at GIPCL Vadodara gas power complex
ترسية عقد – India
Flow-battery, power conversion, switchgear and controls suppliers can approach Bondada for India's largest grid-scale VRFB storage project, due in 18 months.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Vadodara, Gujarat |
| Client / owner | Gujarat Industries Power Company Limited (GIPCL) |
| Awarded to | Bondada Engineering |
| Announced | 23 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Cables, switchgear & electrical materials
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.