Lucknow Metro Phase-1B East-West Corridor – power supply & traction infrastructure (810 days), Sterling and Wilson emerges L1
تأهيل مسبق – India
Switchgear, transformer, cable and SCADA suppliers can approach L1 bidder Sterling and Wilson on UPMRC's INR 314 crore Lucknow Metro Phase-1B power and traction package.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | India · Lucknow, Uttar Pradesh |
| Client / owner | Uttar Pradesh Metro Rail Corporation (UPMRC) |
| Parties | Sterling and Wilson Pvt Ltd (L1, award pending) |
| Value | INR 313.88 crore |
| Announced | 31 Oct 2026 |
| Project type | Rail & metro, Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- BMS, controls & SCADA
- Electrical installation (LV)
- Railway track & systems installation
What to do
Early stage – get on the client's or bidders' vendor lists now.