Magollo wastewater treatment plant (PTAR) – MVCS/CAF push to unblock S/ 390M project, final studies & financing structuring
تأهيل مسبق – Peru
Wastewater treatment EPCs and design consultants should track the CAF-backed Magollo PTAR in Tacna as studies and financing are finalised ahead of tender.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Peru · Tacna |
| Client / owner | Ministerio de Vivienda, Construcción y Saneamiento (MVCS) / Municipalidad Provincial de Tacna |
| Value | PEN 390M |
| Announced | 13 Oct 2026 |
| Project type | Wastewater & sewage |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Concrete works (in-situ) (main package)
- MEP & process design engineering
- Water, sewer & utility networks (incl. HDD)
- Mechanical erection & equipment installation
- Project management & construction supervision
What to do
Early stage – get on the client's or bidders' vendor lists now.