Mallorca–Menorca 3 interconnection – 132 kV HVAC subsea and land cable link, Nexans named preferred supplier (6-month engineering phase ahead of EPCI)
ترسية عقد – Spain
Cable-lay vessel operators, landfall HDD and onshore trenching contractors and substation suppliers: Nexans will scope the Mallorca–Menorca 132 kV link with Red Eléctrica before an EPCI award.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Spain · Mallorca–Menorca (Balearic Islands) |
| Client / owner | Red Eléctrica (Redeia) |
| Awarded to | Nexans (preferred supplier) |
| Announced | 22 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Marine works, dredging & reclamation (main package)
- Water, sewer & utility networks (incl. HDD)
- Earthworks, excavation & site grading
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.