MEWRE 400 kV overhead transmission line from Shagaya solar complex to Wafra substation – L&T recommended (KD 41.45M), CAPT award deferred pending MoF approval
وزارة الكهرباء والماء والطاقة المتجددة – خط نقل هوائي 400 ك.ف من مجمع الشقايا للطاقة الشمسية إلى محطة الوفرة: لارسن آند توبرو (41.45 مليون دينار) وتأجيل الترسية
400 kV line to evacuate Shagaya solar power; tower steel, conductor/insulator suppliers and line-stringing subcontractors should track L&T once CAPT confirms the award.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kuwait · Shagaya / Wafra |
| Client / owner | Ministry of Electricity, Water and Renewable Energy (Kuwait) |
| Awarded to | Larsen & Toubro (proposed awardee) |
| Value | KWD 41.45M |
| Announced | 16 Nov 2026 |
| Project type | Substations & transmission grids, Power plants & renewables |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Piling & deep foundations
- Heavy lifting, rigging & transport
- Earthworks, excavation & site grading
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.