Mid-Island Parkway – Phase I (AED 2.85bn: 8-lane Saadiyat–Umm Yifeenah link, 1.5 km underground incl. 600 m underwater) completes 2027; Phase II 14.5 km extension and 37 km coastal route planned
طريق ميد آيلاند باركواي – المرحلة الأولى (2.85 مليار درهم) تكتمل 2027 مع تخطيط المرحلة الثانية بطول 14.5 كم وطريق ساحلي 37 كم
DMT has signalled a 14.5 km Phase II and a new 37 km coastal route after Phase I – road, tunnel and marine contractors should prepare for prequalification.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Abu Dhabi |
| Client / owner | Department of Municipalities and Transport (DMT) Abu Dhabi |
| Value | AED 2.85bn |
| Announced | 01 Oct 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Tunnelling & microtunnelling (main package)
- Marine works, dredging & reclamation (main package)
- Bridge & flyover construction
- Concrete works (in-situ)
- Dewatering
- Street, area & sports lighting
- Structural & civil design