Mobile River Bridge & Bayway – Phase 1 design-build (2.5-mile cable-stayed bridge + bayway reconstruction), notice to proceed
ترسية عقد – United States
USD 3.2bn cable-stayed bridge now under NTP (groundbreaking 2 Oct); piling, precast, rebar, steel, marine and paving subcontractors should approach the Kiewit-Massman-Traylor JV.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Mobile, Alabama |
| Client / owner | Alabama Department of Transportation (ALDOT) |
| Awarded to | KMT JV (Kiewit Infrastructure South, Massman Construction, Traylor Bros.) |
| Value | USD 3.2bn |
| Announced | 29 Sep 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Concrete works (in-situ) (main package)
- Precast & prestressed concrete (main package)
- Structural steel fabrication & erection
- Rebar cutting, bending & fixing
- Formwork & falsework
- Roads, asphalt paving & road marking
- Marine works, dredging & reclamation
- Steel, rebar & structural sections supply
- Ready-mix concrete, cement & aggregates
- Equipment & crane rental
- Heavy lifting, rigging & transport
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.