Mpatamanga 365.6 MW hydropower storage project – prequalification of EPC contractors (306 MW peaking + 59.6 MW regulating station, substations, 2 lines)
تأهيل مسبق – Malawi
Malawi's largest hydro scheme is prequalifying EPC contractors until 13 Nov 2026 – heavy civil, hydro E&M and HV grid contractors should apply.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 13 Nov 2026 (22 days) |
| Country | Malawi · Shire River (Blantyre/Neno) |
| Client / owner | Mpatamanga Hydro Power Limited (EDF Power Solutions, SN Malawi, Government of Malawi, IFC) |
| Announced | 08 Oct 2026 |
| Deadline | 13 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines (main package)
- Tunnelling & microtunnelling
- Ground improvement, grouting & shoring
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Ready-mix concrete, cement & aggregates
- Camps, temporary facilities & catering
What to do
Early stage – get on the client's or bidders' vendor lists now.