Msimbazi Basin Development Project – 390 m elevated Jangwani bridge & 1.2 km approaches plus flood works (USD 260M, World Bank IDA) – 41% complete, to 2028
ترسية عقد – Tanzania
World Bank-funded Dar es Salaam bridge and flood scheme mid-construction – piling, precast, materials and roadworks suppliers can still chase packages via TANROADS' contractor.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Tanzania · Dar es Salaam (Jangwani) |
| Client / owner | Government of Tanzania – TANROADS (Jangwani bridge works) |
| Value | USD 260M |
| Announced | 09 Oct 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Concrete works (in-situ) (main package)
- Precast & prestressed concrete
- Rebar cutting, bending & fixing
- Roads, asphalt paving & road marking
- Storm-water drainage & culverts
- Ready-mix concrete, cement & aggregates
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.