Muswellbrook hybrid project – 135 MW solar + 100 MW/200 MWh BESS on former coal mine; BESS supply, integration & 20-yr LTSA to e-Storage
ترسية عقد – Australia
Construction under way on a solar-plus-storage plant backed by an Amazon PPA – civil, electrical and HV subcontractors should approach the Bouygues/Equans delivery JV.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Australia · Muswellbrook, Hunter Valley (NSW) |
| Client / owner | OX2 (with Idemitsu Australia) |
| Awarded to | e-Storage (Canadian Solar) – BESS; Bouygues Construction Australia / Equans Solar & Storage JV – project delivery |
| Announced | 07 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Electrical installation (LV)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Cables, switchgear & electrical materials
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.