Mut 220 kV substation expansion – turnkey 66/220 kV transformer bay incl. 220/66 kV equipment, civil works & transformer fire suppression
توسعة محطة محولات موط جهد 220 ك.ف – خلية محول 66/220 ك.ف كاملة بنظام تسليم المفتاح شاملة المعدات والأعمال المدنية ونظام إطفاء المحولات
HV switchgear, transformer-bay equipment, fire-suppression and civil subcontractors can approach the winning contractor for the Mut 220 kV substation expansion.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · Mut (New Valley) |
| Client / owner | Egyptian Electricity Transmission Company (EETC) |
| Awarded to | Epic Technology for Contracting |
| Value | EGP 144.8M |
| Announced | 05 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Fire protection & fire alarm
- Electrical & instrumentation (E&I) installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.