Nacaome water treatment plant – design & rehabilitation (World Bank)
مناقصة – Honduras
Design-and-rehab WTP package.
| Type | Open tender |
|---|---|
| Status | Open – closes 26 Oct 2026 (26 days) |
| Country | Honduras · Nacaome |
| Client / owner | Water Security in the Dry Corridor Project |
| Announced | 28 Sep 2026 |
| Deadline | 26 Oct 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Concrete works (in-situ)
- MEP & process design engineering
- Process piping fabrication & welding
What to do
Register with the client and request the tender documents before the deadline.