Nador West Med sustainable aviation fuel plant (176,000–200,000 t/yr, ~USD 239M) – Shell offtake signed, EBRD weighing up to USD 135M
مصنع وقود الطيران المستدام في ميناء الناظور غرب المتوسط (176–200 ألف طن سنوياً، نحو 239 مليون دولار) – توقيع اتفاقية شراء مع شل
Process EPC contractors and equipment vendors should approach Green Sky Capital early: the SAF/HVO plant at Nador West Med now has a Shell offtake, targets operations in October 2028 and has not named contractors.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Morocco · Nador |
| Client / owner | Green Sky Capital (Green Sky Manara LLC) |
| Value | USD 239M |
| Announced | 02 Nov 2026 |
| Project type | Oil, gas & petrochemical plants, Ports, harbours & marine works |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- MEP & process design engineering
- Electrical & instrumentation (E&I) installation
- Structural steel fabrication & erection
- Concrete works (in-situ)
What to do
Early stage – get on the client's or bidders' vendor lists now.