Nam Dinh I BOT coal-fired thermal power plant (2 x 600 MW) – BOT contract signed, COD 2030
ترسية عقد – Vietnam
Power EPC contractors, boiler/turbine suppliers and civil subcontractors should approach the Taekwang–ACWA Power consortium on its 1,200 MW Nam Dinh I BOT plant.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Vietnam · Ninh Binh |
| Client / owner | Government of Vietnam (BOT contract); EVN as offtaker |
| Awarded to | Taekwang Power – ACWA Power consortium (Nam Dinh First Power Co.) |
| Announced | 13 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Concrete works (in-situ) (main package)
- Piling & deep foundations (main package)
- Structural steel fabrication & erection (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines
- Industrial hot & cold insulation
- Refractory works
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Marine works, dredging & reclamation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.