National Water Carrier (Aqaba–Amman desalination & conveyance) – implementation start set for 18 Nov 2026: 300 Mm³/yr Red Sea SWRO, ~450 km pipeline, 300 MW solar (USD 4.3bn capex)
مشروع الناقل الوطني للمياه (تحلية ونقل العقبة–عمّان) – بدء التنفيذ في 18 تشرين الثاني 2026: تحلية 300 مليون م³ سنوياً وخط أنابيب بطول نحو 450 كم و300 ميغاواط طاقة شمسية (كلفة رأسمالية 4.3 مليار دولار)
Construction of Jordan's flagship desalination and 450 km conveyance scheme is due to begin on 18 Nov; pipe, pump, coating, cathodic protection and civil subcontractors should engage the project company and its EPC contractors now.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Jordan · Aqaba |
| Client / owner | Ministry of Water and Irrigation (Jordan) |
| Value | USD 4.3bn |
| Announced | 12 Nov 2026 |
| Project type | Water, desalination & treatment, Pipelines & utility networks |
Trades and packages needed
- Pipeline construction (main package)
- Water & wastewater treatment equipment (main package)
- Pipes, valves & fittings supply (main package)
- Mechanical erection & equipment installation (main package)
- Earthworks, excavation & site grading (main package)
- Cathodic protection
- Marine works, dredging & reclamation
- MV/HV substations & transmission lines
- Solar PV & battery storage
- Electrical & instrumentation (E&I) installation
- Concrete works (in-situ)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.