New 1,320 MW coal-fired thermal plant in Chhattisgarh – 25-year PSA LoA for 1,234 MW to Uttarakhand (tariff Rs 5.746/kWh, subject to UERC approval)
ترسية عقد – India
BTG/BoP contractors, piping, structural steel and insulation subcontractors should track Adani Power's new 1,320 MW Chhattisgarh unit backed by the UPCL supply award.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Chhattisgarh |
| Client / owner | Uttarakhand Power Corporation Ltd (UPCL) |
| Awarded to | Adani Power Ltd |
| Announced | 14 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection (main package)
- Piling & deep foundations
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Industrial hot & cold insulation
- NDT, inspection & certification
- Scaffolding & access
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.