New bascule bridge over the Ozama River (two movable leaves, ~80 m south of floating bridge) – detailed engineering, construction, testing & commissioning, 24 months (RD$ 4.5bn)
ترسية عقد – Dominican Republic
Steel fabricators, movable-bridge mechanical/electrical specialists and marine piling firms can offer packages to the consortium building the Ozama bascule bridge.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Dominican Republic · Santo Domingo |
| Client / owner | Ministerio de Obras Públicas y Comunicaciones (MOPC) |
| Awarded to | Consorcio Constructora Río Ozama |
| Value | DOP 4.5bn |
| Announced | 21 Oct 2026 |
| Project type | Bridges & tunnels |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Structural steel fabrication & erection (main package)
- Marine works, dredging & reclamation
- Mechanical erection & equipment installation
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Structural & civil design
- Concrete works (in-situ)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.