New Burbank Central Library & Civic Center – progressive design-build contract (4-storey, up to 119,000 sq ft + 310-stall garage), USD 155M cost limit
ترسية عقد – United States
Clark/SOM team now in design for a USD 155M civic library and garage (construction from summer 2027); façade, MEP, fit-out and demolition subs should get on Clark's bid list early.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Burbank, CA |
| Client / owner | City of Burbank |
| Awarded to | Clark Construction Group – California (design partner SOM) |
| Value | USD 155M |
| Announced | 14 Oct 2026 |
| Project type | Mosques, museums & cultural, Offices & commercial buildings |
Trades and packages needed
- Concrete works (in-situ) (main package)
- Façades, curtain wall & cladding (main package)
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- Interior fit-out (main package)
- Demolition & dismantling
- Earthworks, excavation & site grading
- Structural steel fabrication & erection
- Aluminium, glass & glazing
- Roofing & sheeting
- Plumbing & sanitary
- Fire protection & fire alarm
- ELV, ICT & security systems (CCTV, access, cabling)
- Landscaping, irrigation & hardscape
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.