Nithi Bridge – 880 m prestressed box-girder bridge (22 spans, piers up to 100 m) and 2.7 km A9 realignment, EPC/turnkey – construction under way (KES 7.5bn)
ترسية عقد – Kenya
China Wu Yi has started KeNHA's KES 7.5bn high-pier Nithi Bridge on the A9; formwork, post-tensioning, piling, aggregate and heavy-lift suppliers should approach the contractor.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kenya · Nithi Valley (Tharaka Nithi County) |
| Client / owner | Kenya National Highways Authority (KeNHA) |
| Awarded to | China Wu Yi Company Limited |
| Value | KES 7.5bn |
| Announced | 23 Oct 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Precast & prestressed concrete (main package)
- Concrete works (in-situ) (main package)
- Formwork & falsework (main package)
- Rebar cutting, bending & fixing
- Earthworks, excavation & site grading
- Roads, asphalt paving & road marking
- Storm-water drainage & culverts
- Heavy lifting, rigging & transport
- Ready-mix concrete, cement & aggregates
- Steel, rebar & structural sections supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.