Northern Railway – design & construction of Important Bridge No. 75 (14 x 30.5 m composite girder, double track) on Jaunpur–Zafrabad doubling, Lucknow Division
ترسية عقد – India
INR 131 crore rail bridge on a doubling line in UP, with the existing bridge to be dismantled; steel girder fabricators, piling and heavy-lift subcontractors should approach ARSS.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Jaunpur, Uttar Pradesh |
| Client / owner | Northern Railway (Lucknow Division) |
| Awarded to | ARSS Infrastructure Projects Ltd |
| Value | INR 1,311M |
| Announced | 16 Nov 2026 |
| Project type | Rail & metro, Bridges & tunnels |
Trades and packages needed
- Bridge & flyover construction (main package)
- Structural steel fabrication & erection (main package)
- Piling & deep foundations (main package)
- Concrete works (in-situ)
- Rebar cutting, bending & fixing
- Demolition & dismantling
- Structural & civil design
- Heavy lifting, rigging & transport
- Steel, rebar & structural sections supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.