NSW 1,500 MW firming infrastructure – ASL consultation on Firming LTESA and future competitive firming tender (8-hour+ dispatchable capacity, COD by May 2033)
تأهيل مسبق – Australia
Gas-peaker, long-duration storage and pumped-hydro developers and their EPC partners should respond to ASL's consultation (open to 4 Nov 2026) ahead of a 1.5 GW firming tender in early 2027.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · New South Wales |
| Client / owner | ASL (NSW Consumer Trustee) |
| Announced | 14 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- MEP & process design engineering
- Mechanical erection & equipment installation
- MV/HV substations & transmission lines
- Solar PV & battery storage
- Generators, UPS & standby power
What to do
Early stage – get on the client's or bidders' vendor lists now.