NYSERDA selects 950 MW lithium battery storage + 719 MW solar, wind & hydro projects (~1.7 GW)
ترسية عقد – United States
Battery integrators, EPCs and electrical contractors should contact the selected developers for the BESS and renewables projects due online by 2030.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · New York State |
| Client / owner | NYSERDA |
| Awarded to | Key Capture Energy; Grid Connected Infrastructure & Neoen US (Lighthouse Energy Storage); others |
| Value | USD 3.7bn (private investment) |
| Announced | 28 Sep 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.