O Mon 3 1,155 MW combined-cycle gas power plant – turnkey EPC incl. steam turbine supply
ترسية عقد – Vietnam
Turbine, BOP mechanical, HV electrical and piping subcontractors should approach Doosan Enerbility and PTSC for O Mon 3 packages through 2030.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Vietnam · O Mon, Can Tho |
| Client / owner | Vietnam Oil and Gas Group (PVN) |
| Awarded to | Doosan Enerbility (with PTSC) |
| Value | KRW 840bn (~USD 600M) |
| Announced | 30 Sep 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ) (main package)
- Heavy lifting, rigging & transport (main package)
- Piling & deep foundations
- Structural steel fabrication & erection
- Pressure vessels, tanks & heat exchangers
- Industrial hot & cold insulation
- NDT, inspection & certification
- Scaffolding & access
- Cables, switchgear & electrical materials
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.