OETC 400kV Sadaf grid station with 400kV LILO connection to Suwaihat–Duqm Industrial line – design, supply, installation, testing and commissioning
محطة صدف للشبكة بجهد 400 كيلوفولت مع ربط دخول وخروج بخط السويحات–الدقم الصناعية – التصميم والتوريد والتركيب والاختبار والتشغيل
Switchgear, transformer, HV cable and civil subcontractors should approach MADKOUR for OETC's new 400kV Sadaf grid station serving Duqm industry.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Oman · Sadaf, Al Wusta (Duqm) |
| Client / owner | Oman Electricity Transmission Company (OETC, Nama Group) |
| Awarded to | MADKOUR Projects (Oman) |
| Announced | 08 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.