Ogaden LNG Phase II (Calub gas field) – construction & toll-processing contract signed with GCL Energy and Jurong Group: new liquefaction modules, storage & transport infrastructure
ترسية عقد – Ethiopia
Cryogenic equipment suppliers, piping/insulation and E&I subcontractors: Jurong and GCL are starting the second LNG phase at Calub, Ethiopia, with construction of the first module to begin as soon as possible.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Ethiopia · Calub (Somali Region) |
| Client / owner | GCL Energy Investment Co. (Ethiopia branch) / Ministry of Mines |
| Awarded to | Jurong Group (Holdings) Co., Ltd. |
| Announced | 19 Oct 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Industrial hot & cold insulation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Camps, temporary facilities & catering
- Construction logistics, freight & customs
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.