Oxagon Industrial Quarter interim modular wastewater treatment plant – 35,000 m³/d industrial + 1,000 m³/d sanitary packages (DBO), bid deadline extended
محطة معالجة مياه الصرف المعيارية المؤقتة في منطقة أوكساجون الصناعية – 35,000 م³/يوم صناعية + 1,000 م³/يوم صحية (تصميم وبناء وتشغيل)، تمديد موعد تقديم العطاءات
Design-build-operate tender for a de-mountable modular industrial WWTP (5,000 m³/d trains, expandable to 45,000 m³/d, 3 years O&M) – water-treatment contractors and package vendors still have time to bid.
| Type | Open tender |
|---|---|
| Status | Open – deadline not published |
| Country | Saudi Arabia · Oxagon, Neom |
| Client / owner | Neom / Enowa |
| Announced | 08 Oct 2026 |
| Project type | Wastewater & sewage, Factories & industrial plants |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Mechanical erection & equipment installation (main package)
- Facility management & O&M services (main package)
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- Pipes, valves & fittings supply
What to do
Register with the client and request the tender documents before the deadline.