PAHW South Saad Al-Abdullah Residential City – supply, installation & maintenance of 20 x 132/11 kV main substations (Phases 3 & 4)
المؤسسة العامة للرعاية السكنية – توريد وتركيب وصيانة 20 محطة تحويل رئيسية 132/11 ك.ف في مدينة جنوب سعد العبدالله (المرحلتان الثالثة والرابعة)
Two Kuwaiti contractors must buy transformers, GIS/switchgear, cables and protection systems and subcontract civils for 20 grid substations in a new 24,500-home city.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kuwait · South Saad Al-Abdullah (Al-Jahra) |
| Client / owner | Public Authority for Housing Welfare (PAHW) |
| Awarded to | Sayed Hamid Behbehani & Sons (Phase 3, KWD 32.195M); Al-Ahleia Switchgear / National Electrical Switchboards (Phase 4, KWD 31.9M) |
| Value | KWD 64.1M |
| Announced | 17 Nov 2026 |
| Project type | Substations & transmission grids, Villas & housing communities |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.