Pertamina EP – provision of 350 HP drilling/workover rig, Field Pendopo (SX10000139A) and Field Bentayan (SX10000141A) – prequalification
تأهيل مسبق – Indonesia
Onshore drilling and workover rig contractors with 80% local content should pick up the prequalification documents via SMART GEP by 20 Oct 2026 for these two Pertamina EP field rigs.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Closed 20 Oct 2026 |
| Country | Indonesia · Prabumulih, South Sumatra (Field Pendopo & Field Bentayan) |
| Client / owner | PT Pertamina EP |
| Announced | 15 Oct 2026 |
| Deadline | 20 Oct 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Equipment & crane rental (main package)
- Manpower supply (main package)
- Shutdown, turnaround & plant maintenance
- Construction logistics, freight & customs
What to do
Early stage – get on the client's or bidders' vendor lists now.