Petro Rabigh bottom-of-the-barrel upgrade – residue/high-sulphur fuel oil conversion to diesel and lighter distillates: contractors preparing bids
مشروع بترورابغ لتحويل قاع البرميل – تحويل زيت الوقود عالي الكبريت والمخلفات الثقيلة إلى ديزل ومقطرات خفيفة: المقاولون يعدّون عطاءاتهم
Refinery EPC contractors and their piping, vessel and E&I subcontractors should engage on Petro Rabigh's residue-upgrade project while bids are being prepared.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Saudi Arabia · Rabigh |
| Client / owner | Petro Rabigh (Rabigh Refining & Petrochemical Co., Aramco subsidiary) |
| Announced | 30 Oct 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Heavy lifting, rigging & transport
- Industrial hot & cold insulation
- NDT, inspection & certification
- Scaffolding & access
- Structural steel fabrication & erection
What to do
Early stage – get on the client's or bidders' vendor lists now.