Philip Wind Energy Center – 333 MW, up to 87 turbines, substation and 5.5-mile 230 kV gen-tie (USD 750M)
ترسية عقد – United States
Crane, heavy-haul, foundation concrete and HV substation/line subcontractors should contact Blattner; turbine erection runs into 2027 ahead of a March 2028 COD.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Haakon County, SD |
| Client / owner | Philip Wind Partners (Invenergy) |
| Awarded to | Blattner (Quanta Services) |
| Value | USD 750M |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Heavy lifting, rigging & transport (main package)
- Equipment & crane rental (main package)
- Concrete works (in-situ) (main package)
- MV/HV substations & transmission lines (main package)
- Earthworks, excavation & site grading
- Roads, asphalt paving & road marking
- Electrical installation (LV)
- Cables, switchgear & electrical materials
- Ready-mix concrete, cement & aggregates
- Construction logistics, freight & customs
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.