PISF (São Francisco River Integration Project) – 30-year federal PPP for operation & maintenance of water adduction to CE, PB, PE and RN (edital published)
مناقصة – Brazil
Brazil's first federal water PPP: 30-year O&M of the São Francisco transfer system with ~BRL 600M capex; bids open 5 Mar 2027 – water operators, pump/electromechanical and O&M firms should form consortia.
| Type | Open tender |
|---|---|
| Status | Open – closes 05 Mar 2027 (106 days) |
| Country | Brazil |
| Client / owner | Ministério da Integração e do Desenvolvimento Regional (MIDR) – União |
| Value | BRL 600M capex + ~BRL 6.7bn opex |
| Announced | 12 Nov 2026 |
| Deadline | 05 Mar 2027 |
| Project type | Water, desalination & treatment, Pipelines & utility networks |
Trades and packages needed
- Facility management & O&M services (main package)
- Mechanical erection & equipment installation (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- MV/HV substations & transmission lines
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Concrete works (in-situ)
- Shutdown, turnaround & plant maintenance
- Pipes, valves & fittings supply
What to do
Register with the client and request the tender documents before the deadline.