PJM fast-track interconnection approval – Engie Crawford 860 MW (PA) & Morrow 800 MW (OH) battery storage + LS Power 455 MW Hunterstown gas uprate
تأهيل مسبق – United States
BESS integrators, HV substation EPCs and gas-turbine uprate suppliers can position early on 2.1 GW of PJM projects targeted online by mid-2029; EPCs not yet named.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Pennsylvania / Ohio |
| Client / owner | Engie IR Holdings; LS Power |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Mechanical erection & equipment installation
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
What to do
Early stage – get on the client's or bidders' vendor lists now.