Platte-Winner Bridge replacement – new SD Highway 44 Missouri River crossing (state's longest bridge), groundbreaking held, construction 2027–2031
ترسية عقد – United States
Piling, precast girder, rebar, marine equipment and heavy-lift suppliers should contact Ames Construction now that the USD 290M Missouri River bridge has broken ground.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Platte–Winner, South Dakota |
| Client / owner | South Dakota Department of Transportation |
| Awarded to | Ames Construction |
| Announced | 22 Oct 2026 |
| Project type | Bridges & tunnels |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Precast & prestressed concrete (main package)
- Marine works, dredging & reclamation
- Structural steel fabrication & erection
- Rebar cutting, bending & fixing
- Formwork & falsework
- Ready-mix concrete, cement & aggregates
- Heavy lifting, rigging & transport
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.