Playas de Rosarito seawater RO desalination plant – stage 1 2,200 l/s (stage 2 up to 4.4 m3/s with 29 km aqueduct to Tijuana/Rosarito/Ensenada); construction started (MXN 12,861.4M)
ترسية عقد – Mexico
RO membrane, high-pressure pump, intake/outfall marine and electrical subcontractors should contact Cox Water as construction of Latin America's largest desalination plant begins.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Mexico · Playas de Rosarito, Baja California |
| Client / owner | Government of Baja California / Conagua (delivery via CESPT) |
| Awarded to | Cox Energy / Cox Water |
| Value | MXN 12,861.4M |
| Announced | 03 Nov 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Pipes, valves & fittings supply (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Electrical & instrumentation (E&I) installation
- Concrete works (in-situ)
- Marine works, dredging & reclamation
- Process piping fabrication & welding
- MV/HV substations & transmission lines
- BMS, controls & SCADA
- Water, sewer & utility networks (incl. HDD)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.