Port Authority of Douala – 300 MW gas-fired power plant at Douala-Bonabéri port (phase 1: 102 MW + ~200 km 26-inch Kribi–Edéa–Douala gas pipeline), BOT technical agreement with Genertec CMC-led consortium, China Energy as builder
ترسية عقد – Cameroon
CFAF 628bn BOT gas power plant and 200 km gas pipeline at Douala port signed 16 Nov; pipeline, mechanical, E&I and HV subcontractors should approach Genertec CMC / China Energy.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Cameroon · Douala (Bonabéri) |
| Client / owner | Port Autonome de Douala (PAD) / Douala Port Power Corporation (DPPC SA) |
| Awarded to | Genertec CMC-led consortium (construction: China Energy) |
| Value | USD 1060M |
| Announced | 16 Nov 2026 |
| Project type | Power plants & renewables, Pipelines & utility networks |
Trades and packages needed
- Pipeline construction (main package)
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Concrete works (in-situ)
- Piling & deep foundations
- NDT, inspection & certification
- Cathodic protection
- Heavy lifting, rigging & transport
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.