Port Qasim integrated LNG merchant hub – 560,000 m³ storage terminal (phase 1) and 1,100 km upcountry gas pipeline (phase 2), USD 4.4bn proposal
تأهيل مسبق – Pakistan
Early-stage LNG storage and pipeline mega-project (site clearance secured, OGRA provisional licence filed); LNG tank, pipeline and marine EPC firms should engage the sponsors before FEED/EPC procurement.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Pakistan · Port Qasim, Karachi |
| Client / owner | Consortium led by Global Vision Energy Partners, Khanjee Holdings and General Mediterranean Holding |
| Value | USD 4.4bn |
| Announced | 02 Nov 2026 |
| Project type | Oil, gas & petrochemical plants, Pipelines & utility networks, Ports, harbours & marine works |
Trades and packages needed
- Pressure vessels, tanks & heat exchangers (main package)
- Pipeline construction (main package)
- Process piping fabrication & welding (main package)
- Marine works, dredging & reclamation
- Cathodic protection
- Industrial hot & cold insulation
- NDT, inspection & certification
- Electrical & instrumentation (E&I) installation
- Pipes, valves & fittings supply
- Piling & deep foundations
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.