Porto Alegre flood-drainage works portfolio – BRL 4bn (macro/micro-drainage, pump stations, dikes; packages BRL 80–150M)
تأهيل مسبق – Brazil
Drainage, pumping-station and dike contractors should prepare for Porto Alegre's multilateral-funded works packages of BRL 80–150M each.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Brazil · Porto Alegre |
| Client / owner | Prefeitura de Porto Alegre |
| Value | BRL 4bn |
| Announced | 29 Sep 2026 |
| Project type | Wastewater & sewage, Pipelines & utility networks |
Trades and packages needed
- Storm-water drainage & culverts (main package)
- Earthworks, excavation & site grading (main package)
- HVAC, pumps & mechanical equipment supply
- Piling & deep foundations
- Concrete works (in-situ)
- Dewatering
- Water, sewer & utility networks (incl. HDD)
What to do
Early stage – get on the client's or bidders' vendor lists now.