Post-earthquake road and bridge repair programme – 47 critical road points, 23 bridges, Tonosí–Búcaro road rebuild
تأهيل مسبق – Panama
Road and bridge contractors should watch for Panama MOP's post-earthquake repair packages in Veraguas and Los Santos.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Panama · Veraguas / Los Santos |
| Client / owner | Ministerio de Obras Públicas (MOP) |
| Announced | 21 Oct 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Roads, asphalt paving & road marking (main package)
- Bridge & flyover construction (main package)
- Storm-water drainage & culverts
- Concrete works (in-situ)
- Ready-mix concrete, cement & aggregates
- Equipment & crane rental
- Ground improvement, grouting & shoring
What to do
Early stage – get on the client's or bidders' vendor lists now.