Project Atlas AI data centre campus – phase 1, 180 MW plus 200+ MW solar park and ~800 MWh BESS (USD 2.15bn); operator search and design revision under way
مشروع أطلس لمراكز بيانات الذكاء الاصطناعي في برج العرب الجديدة – المرحلة الأولى 180 ميجاوات مع محطة شمسية وبطاريات (2.15 مليار دولار)
Early-stage USD 2.15bn AI data centre campus seeking an operator and finalising design ahead of end-2027 financial close; data-centre design, MEP, solar/BESS EPC and cooling suppliers should position early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Egypt · New Borg El Arab (Alexandria) |
| Client / owner | Income Egypt for Infrastructure & Investment / Sustainable Infra Capital (SIC) |
| Value | USD 2.15bn |
| Announced | 15 Nov 2026 |
| Project type | Data centres, Power plants & renewables |
Trades and packages needed
- MEP & process design engineering (main package)
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines (main package)
- Solar PV & battery storage (main package)
- Generators, UPS & standby power (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- Architecture & design
- Project management & construction supervision
- Fire protection & fire alarm
- BMS, controls & SCADA
- Pre-engineered & modular buildings
What to do
Early stage – get on the client's or bidders' vendor lists now.