Qiongzhong Huangzhuping 1,800 MW (6×300 MW) pumped storage power station – public selection of investor/developer
تأهيل مسبق – China
Hainan is choosing an investor for a CNY 8.4bn pumped-storage plant (construction within 6 months of filing) – hydro EPCs and equipment makers should position with bidders such as PowerChina/CSG.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | China · Qiongzhong (Hainan) |
| Client / owner | Hainan Provincial Development and Reform Commission |
| Value | CNY 8.37bn |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Tunnelling & microtunnelling (main package)
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines (main package)
- Structural & civil design
- Land surveying & geotechnical investigation
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
What to do
Early stage – get on the client's or bidders' vendor lists now.