Quang Trach II LNG-fired power plant (~1,613 MW, 2 units) – EPC contractor selected, construction launched (USD 1.55bn)
ترسية عقد – Vietnam
Piping, mechanical erection, E&I, piling and heavy-lift subcontractors can approach the CEEC–LILAMA consortium as the 1.6 GW Quang Trach II LNG power plant moves into construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Vietnam · Hon La EZ, Quang Tri |
| Client / owner | Vietnam Electricity (EVN) – Power Project Management Board No. 2 |
| Awarded to | China Energy Engineering Corporation – LILAMA consortium |
| Value | USD 1.55bn |
| Announced | 20 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Piling & deep foundations
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Industrial hot & cold insulation
- Scaffolding & access
- Manpower supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.