Ras Markaz crude oil storage expansion to ~10M barrels within three years (OTTC) and Vopak energy-storage JV in Duqm SEZ
توسعة تخزين النفط الخام في رأس مركز إلى نحو 10 ملايين برميل خلال ثلاث سنوات (شركة عمان لصهاريج التخزين) ومشروع مشترك مع فوباك للتخزين في المنطقة الاقتصادية بالدقم
OQ plans a large onshore tank-farm build-out at Ras Markaz; tank fabricators, piping, coating, cathodic protection and fire-protection contractors should position early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Oman · Duqm |
| Client / owner | Oman Tank Terminal Company (OQ Group) |
| Announced | 30 Sep 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Pressure vessels, tanks & heat exchangers (main package)
- Process piping fabrication & welding (main package)
- Industrial blasting, coating & painting
- Cathodic protection
- NDT, inspection & certification
- Piling & deep foundations
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
- Fire protection & fire alarm
- Pipes, valves & fittings supply
What to do
Early stage – get on the client's or bidders' vendor lists now.