Ras Markaz crude oil storage expansion to ~10M barrels within three years (OTTC) and Vopak energy-storage JV in Duqm SEZ

توسعة تخزين النفط الخام في رأس مركز إلى نحو 10 ملايين برميل خلال ثلاث سنوات (شركة عمان لصهاريج التخزين) ومشروع مشترك مع فوباك للتخزين في المنطقة الاقتصادية بالدقم

OQ plans a large onshore tank-farm build-out at Ras Markaz; tank fabricators, piping, coating, cathodic protection and fire-protection contractors should position early.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryOman · Duqm
Client / ownerOman Tank Terminal Company (OQ Group)
Announced30 Sep 2026
Project typeOil, gas & petrochemical plants

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Contract awardAlgeria · الجزائرContract awarded – subcontracting open

Menzel Ledjmet Nord gas field development – contract won by Indonesian contractor

Awarded to Indonesian contractor (not named in public summary) · Client: Not disclosed in public summary

Contract awardGuyanaContract awarded – subcontracting open

Longtail development – FPSO construct & install (250,000 bpd condensate, 1.2 bcf/d gas, ~2M bbl storage, spread-moored ~1,750 m), Fast4Ward hull

Awarded to SBM Offshore · Client: ExxonMobil Guyana Limited

Pre-qualification / EOILibya · ليبياUSD 1bnOpen – deadline not published

Dahra oil field development (~USD 1bn) – Libya considering tendering project to ramp up production

Client: Libyan oil sector (operator not named in public summary)

Pre-qualification / EOIUnited StatesUSD 3.1bn (plant ~USD 2.85bn)Open – deadline not published

Kentucky Power 769 MW gas combined-cycle plant at Big Sandy site plus new 765/345 kV Boyd County substation for TeraWulf Muskie data campus – PSC applications filed (cases 2026-00323/00324, COD Q2 2031)

Client: Kentucky Power (AEP)

Contract awardUnited StatesUSD 121.5MContract awarded – subcontracting open

Moccasin Bend Wastewater Treatment Plant upgrade – replacement of 45-year-old oxygen production system and 1960s anaerobic digesters, capacity and odour improvements (USD 121.5M city loan approved)

Awarded to Archer Western Construction · Client: City of Chattanooga – Moccasin Bend Wastewater Treatment Plant