Ruvuma 2,000+ MW coal and solar power complex (Hongwang Tanzania Holdings/HWHG) – TANESCO in talks to take 200 MW (TZS 7.8tn, ~USD 3bn)
تأهيل مسبق – Tanzania
Power-plant EPC firms, solar and boiler/turbine equipment suppliers and HV grid contractors should track this large coal-and-solar investment in southern Tanzania as offtake talks with TANESCO advance.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Tanzania · Ruvuma |
| Client / owner | Hongwang Tanzania Holdings (HWHG) / TANESCO (offtaker) |
| Value | TZS 7.8tn (~USD 3bn) |
| Announced | 23 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines (main package)
- Solar PV & battery storage (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Process piping fabrication & welding
- Earthworks, excavation & site grading
What to do
Early stage – get on the client's or bidders' vendor lists now.